Opening up London homes safely: wall removals, steelwork, new openings and reconfigured floors — engineered, approved and finished properly.

Open-plan structural renovation — exposed steel or finished opening

Where good layouts come from

Most London houses were designed for a different century: small rooms, closed kitchens, dark centres. The layouts people actually want — open kitchen-dining spaces, connected reception rooms, light through the plan — almost always require structural work.

We take structural alterations from engineering to redecoration: the structural engineer’s design, temporary works, steel installation, building control approval, and then the part many builders treat as an afterthought — making good so the alteration is invisible except for the space it created.

Structural work rarely travels alone. It anchors full renovations, extensions and basements — and we deliver it within those programmes or as a standalone project.

What's included

  • Structural engineering

    Calculations and drawings by a structural engineer, coordinated by us.

  • Temporary works

    Propping and sequencing designed so the house is supported at every stage.

  • Steelwork & openings

    Beams, posts and padstones installed and inspected before closing up.

  • Load-bearing wall removal

    Full or partial removals, chimney breast removals and floor reconfiguration.

  • Building control

    Approvals and inspections managed through to completion certificates.

  • Making good

    Plastering, flooring and decoration so the alteration reads as architecture, not surgery.

Party walls, approvals and neighbours

Structural work in terraced and semi-detached London means party wall duties: notices, schedules of condition and often an award before work starts. We run this process early so it never delays the programme, and sequence noisy work considerately.

Unsure whether a wall is load-bearing, or what an opening would involve? That’s exactly what the first site visit answers.

Book a Consultation

Structural renovation FAQs

How do I know if a wall is load-bearing?

Direction of floor joists, what sits above, and original construction all matter — and terraces hide surprises. We confirm on site, and a structural engineer designs any removal; guessing is how cracks happen.

Do structural alterations need permission?

Internal structural work needs building regulations approval rather than planning permission in most cases; party wall agreements apply when the structure is shared. Listed buildings need consent for internal alterations too.

How long does a structural opening take?

A single opening including making good typically takes two to four weeks; whole-floor reconfigurations run longer. Structural work is usually the first act of a bigger programme.

Want to open up your home?

Book a consultation and we’ll tell you what’s structural, what it involves and what it costs.