House Refurbishment in London

Whole-house programmes for London houses: every floor, every room, one sequence, one standard of finish — managed from scaffold to snagging.

Refurbished London house — staircase or full-height view

A house is a sequencing problem

Refurbishing a whole house is different from refurbishing rooms. Work has to cascade in the right order — roof and externals before decoration, services before plaster, wet rooms before flooring — or trades return to damage finished work. Our programmes are built around that sequence.

A typical whole-house refurbishment covers external repairs and decoration from one scaffold hire, full rewiring and replumbing, new heating, replaced bathrooms and kitchen, plastering throughout, flooring, and a single decorating package to close.

For houses that also need walls moved, floors opened or space added, see full home renovation and extensions — the same team runs both, so a project can grow without changing hands.

What's included

  • External works

    Roof repairs, brickwork, sash windows and external decoration from one scaffold hire.

  • Full services replacement

    Rewiring, replumbing and new heating for the whole house, certified at handover.

  • Wet rooms

    Bathrooms and en-suites renewed in the correct build sequence.

  • Kitchen

    A new or refreshed kitchen delivered within the same programme.

  • Plastering & decoration

    Every room plastered and decorated in one final package for a consistent finish.

  • Programme management

    One written sequence, weekly reporting, one point of contact.

Whole-house refurbishment costs

The economics favour doing the whole house at once: one scaffold, one site setup, trades on site once rather than five times. We quote the complete programme itemised by floor and by trade so you can see — and adjust — every part.

Start with the cost guide: refurbishment costs in London.

Request a Quote

House refurbishment FAQs

Should we refurbish before moving in?

If you can, yes — an empty house refurbishes faster and cheaper, and you move into finished rooms. We regularly run programmes between exchange and move-in dates.

Can the work be phased?

Yes, floor by floor — though services replacement is best done in one pass. We’ll show you the cost difference between phased and single-programme options.

Do you handle external and roof work too?

Yes. Externals are part of the programme — doing them first, from one scaffold hire, protects the interior work that follows.

Planning a whole-house programme?

Book a consultation and we’ll walk the house with you and map the right sequence, scope and budget.